Tender was presented by a young gun Simon. He meticulously went through the tender document and explained everything in laymens terms which was great.I haven't signed the Tender as yet as there are still a few things in Work in Progress.
Only thing I was really disappointing with was the Garage. Originally we had plans to extend the garage but was told during tender it was not possible due to building envelope.
But everything else is coming along fine.
To date, a lot of the what I've thought about was mainly the bigger ticket items. So alot of the smaller details I have missed.
Below are still some questions I need answered before I sign my life away :)
Layout will be as follow - Great thing is with this setting.
I have plenty of space 11m x 18m to start my hobby farm. Totally looking forward to be self sufficient.
Outstanding Issues that needs clarification
* Final check if there is any other option on Terrace dwarf wall
* Check if size of concrete pad for water tank can be specified at later date once dimensions of water tank is known
* Questioned what normally happens after water tank is empty? Can the toliets still be used?
* Questioned why sarking pricing have increased
* Question if there are any waste under each garden tap
* Question if internal garage is fully plastered
* Question where the solar panel will be located
* Need confirmation of what part of roof will not have eaves
* Question if plaster walls can be installed with 25mm gap at bottom to allow flooring expansion
* Request for Taps in Laundry to be relocated inside laundry cabinetry
* Request of NBN Box can be relocated into Store Room
Notes to be added to tender,
* 25mm gap between floor and door,
* All internal flooring to be sanded smooth ready for installation of hardwood floors
* Garage Concrete to be smoothed
* Alfresco and Terrace floor to be smooth ready for tiling